| Client: |
Beaumont Hospital |
| Project: |
Transition Lounge |
| Size: |
300 sq metres |
| Project Timeframe: |
9 weeks |
Requirement:
Additional ward space was required to relieve
the pressure on the existing Accident &
Emergency Department. The hospital proposed
a transit lounge/ ward to cater for the overflow.
The Hospital appointed leading healthcare architects,
Moloney O’Beirne, and began design work
on the new ward.
|
Solution:
Roan Building Systems received an initial enquiry from
the architects and was asked to undertake preliminary
design work on the specification & layout of the
building. The contract then went to public tender, which
Roan Building Systems won, & the state-of-the-art
RoanPlan Modular Building was chosen to house the new
ten-bed ward.
The building would be linked to the existing Accident
& Emergency Department; Roan Building Systems was
responsible for the breakthrough & alterations.
Architectural aluminium external cladding matched that
of the main hospital creating a seamless finish.
As main contractor Roan Building Systems were also responsible
for PSCS & PSDP.Infection control is a critical
issue when working in a live hospital environment, all
site personnel were required to adhere to Roan Building
Systems strict infection control policy.
The new 300sq mtr ward was constructed off-site &
craned into position over the existing accident &
emergency department. The lift & installation was
completed in one day & was clad to blend in seamlessly
with the main hospital. As infection control measure
the link between the new department & the main Intensive
Care Ward corridor was not broken through until the
modular building was complete.
Scope of Works:
-
Civil works: reducing level,
foundations, connection to services, links &
alterations to main hospital building
-
Nurses call facility
-
Bed-head trunking
-
Extension of existing hospital
heating systems
-
Partitioning
-
Floor covering including coved
skirting
-
Decoration
-
Project supervision of all contractors
-
Cladding of exterior to match
main hospital building
Innovative Solutions:
The complete off-site fitout of the ward expedited the
programme time greatly. The off-site construction of
the building also greatly reduced the health & safety
risk:
- Significantly reduces the number of vehicle movements
on site
- Greatly reduced the threat of aspergillious by reducing
the onsite construction element
- Reduced working at height requirements
The 10 week programme timeframe was over 50% faster
than that offered by traditional building methods. Precise
project management by Roan Building Systems experienced
team ensured this ambitious target was achieved.
Image Gallery:
|
 |
 |
| (click
image for larger view) |
(click
image for larger view) |
(click
image for larger view) |
|
|
 |
 |
| (click
image for larger view) |
(click
image for larger view) |
(click
image for larger view) |
|
|
|
|
|
 |
| Copyright
© 2010 Roan Building Systems ™ All Rights
Reserved |
|
|
| Home
| Hire | Contact
Us |
|
Roan Building Systems, Monckton Road Industrial Estate, Denby
Dale Road, Wakefield, WF2 7AL. Call Today: 0845
121 1687 | Email: sales@roanbuildings.co.uk |

| Siteserv
Group Companies: |
 |
 |
 |
 |
 |
 |
 |
|
| Website Designed
by: |
 |
Web
Creations |
|
|
|