| Client: |
Grangegorman D7 Educate Together |
| Project: |
Two Storey, Sixteen Classroom School |
| Size: |
2,500 sq metres |
| Project Timeframe: |
16 weeks |
Requirement:
Roan Building Systems were awarded the contract
to design & build a purpose built two storey
sixteen classroom school building & complete
development of a green-field site. The new school
building compromised sixteenclassrooms, resource
rooms, multipurpose room, library, special needs
room, staff room, toilets & administrative
offices. |
Solution:
Internal fit-out included partitioning, internal doors,
Marmoleum floor covering, gas fired central heating
system, telephone & data systems, PA systems and
full Department of Education & Science specification
mechanical & electrical fitout. Externally the building
was finished with large architectural windows &
a deep fascia giving the building a distinctly modern
feel.
Roan Building Systems were also responsible for the
overall development of the Greenfield site from foundations,
car-parks, perimeter fencing, play areas & landscaping.
Roan Building Systems’s experience & state
of the art factory facilities enabled the company complete
the 2,500sq mtr project in 16weeks. RoanKabin were able
to manufacture & fitout the core building in the
factory, while simultaneously developing the site.
Minister Sean Haughey opens Grangegorman school
Roan Building Systems's Grangegorman Project has scored
air test rating of 4.38*. The new Educate Together school
was officially opened by Minister Sean Haughey recently.
According to current building regulations (Part L 2007)
'a performance level of 10m3/h/m2 represents a reasonable
upper limit for air permeability'. The Dept of Education
and Science has specified an upper limit for air permeability
of 5 m3/hr/m2 at 50 Pa, a far superior level than that
recommended in Part L. The Roan Building Systems Building
at Grangegorman, when pressure tested, achieved an impressive
result of 4.3 m3/hr/m2 at 50 Pa which exceeds all requirements
and contributes greatly to the Energy Efficiency of
the school.
*0 is the best result and 10 is the standard value to
comply with building regulations.
Image Gallery:
|
 |
 |
| (click
image for larger view) |
(click
image for larger view) |
(click
image for larger view) |
|
|
 |
 |
| (click
image for larger view) |
(click
image for larger view) |
(click
image for larger view) |
|
|
|
|
|
 |
| Copyright
© 2012 Roan Building Systems ™ All Rights
Reserved |
|
|
| Home
| Hire | Contact
Us |
| Accreditations: |
 |
 |
|
Roan Building Systems, Monckton Road Industrial Estate, Denby
Dale Road, Wakefield, WF2 7AL. Call Today: 0845
121 1687 | Email: sales@roanbuildings.co.uk |

| Siteserv
Group Companies: |
 |
 |
 |
 |
 |
 |
 |
|
| Website Designed
by: |
 |
Web
Creations |
|
|
|